Course
Point to point from the Lake Barkley Bridge west to the finish at Eggner's Ferry Bridge on Kentucky Lake, 13.6 miles in total. The first 3.6 miles are paved, followed by 8.2 miles of winding packed-gravel woodland trail with moderate elevation change, then a final 1.8 miles back on pavement. Run solo or as a two- or three-person relay.
Key dates
- ★Race dayOctober 2027 · date to be announced
About
The course starts on the Canton side of the Lake Barkley Bridge and crosses into the beautiful Land Between the Lakes Recreation Area. The course follows the paved path along Highway 80 until connecting with the Central Hardwoods Scenic Trail. Runners stay on the trail for its entirety ending at Fenton. The course connects with the Kentucky Lake Bridge where runners will cross and finish just west of Kentucky Lake along Highway 80.
Save LBL BRIDGE TO BRIDGE TRAIL RUN to your season and RunCalendar reminds you the morning entries open and before they close. Free on iPhone, no account needed.
-
-
-
The American Bluegrass Classic
Inaugural marathon debuting in Paducah, Kentucky
-
Urban Bourbon Half Marathon
Passes Louisville's bourbon distilleries downtown
A confirmed date shows its day; a provisional one shows only its month, because we won't claim a day we don't have. This page is rebuilt every night from the RunCalendar catalogue.
